Creating Control Points
SupplyOn automatically creates a control point (site) with the supplier registration. This is connected by a “network link” with the buying company.
You create a control point as follows:
- Click on the “Administration / Logistics Settings” menu item. SupplyOn now shows you the Supply Chain Directory.
- Click on “Create New Control Point”.
- Enter the data for the control point. Mandatory fields have an asterisk (*).
- Click on “Save”.