If you combine different delivery notes into one shipping notification, the section ‘Material Position’ must be repeated as often as necessary.

Each material position needs the same structure.
The following information is part of the due delivery and needed for a successful xml-file upload.
- Material number – see line 87
- Delivery Date – see line 96
- Required/Delivery Quantity – see line 98
- Order number – see line 101
- Order position – see line 102

Here you can see the line item details of this order in SupplyOn SCM.
